15 Illustrations for fixation of TRCA in new slab i.r.o. GDS joined before 01.07.2018: GDS Wages Order

GDS Wages Order: 15 Illustrations for fixation of TRCA in new slab i.r.o. GDS joined before 01.07.2018
Annexure II

Illustration for fixation of TRCA in new slab in respect of Gramin Dak Sevak joined before 1.7.2018 
Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
MC/MP/MM with work load of 3 hours ₹2,295-45-3,645
₹10,000- 24,470
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹2,880
2 TRCA enhanced by fitment factor of 2.57(rounded off to the nearest rupee) ₹7,402
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-1 of TRCA Matrix) ₹10,000
4 TRCA  on 1.7.2019 (Stage-2 of Level-1  of TRCA Matrix)* ₹10,300

Illustration 2
Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
MC/MP/MM with work load of 3 hours 45 minutes ₹2,870-50-4,370 ₹10,000- 24,470
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹2,920
2 TRCA enhanced by fitment factor of 2.57(rounded off to the nearest rupee) ₹7,504
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Staqe-1 of Level-1 of TRCA Matrix) ₹10,000
4 TRCA on  1.7.2019 (Stage-2 of Level-1  of TRCA Matrix)* ₹10,300



Illustration 3

Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
MC/MP/MM with work load of 3 hours 45 minutes ₹2,870-50-4,370 ₹10,000-24,470
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹3,920
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) ₹10,074
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-2 of Level-1 of TRCA Matrix) ₹10,300
4 TRCA on 1.7.2019 (Stage-3  of Level-1  of TRCA Matrix)* ₹10,610

gds-order-annexure2-Illustration1-3-paramnews

Illustration 4

Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
MC/MP/MM with work load of 3 hours 45 minutes and upto 5 hours 3,635-65-5,585 12,000-29,380
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹3,830
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) ₹9,843
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-2 of TRCA Matrix) ₹12,000
4 TRCA on 1.7.2019 (Stage-2 of Level-2 of TRCA Matrix)* ₹2,360

Illustration 5

Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
MC/MP/MM with work load of 3 hours 45 minutes and upto 5 hours ₹3,635-65-5,585 ₹12,000-29,380
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹4,740
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) ₹12,182
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-2 of Level-2 of TRCA Matrix) ₹12,360
4 TRCA on 1.7.2019 (Stage-3 of Level-2 of TRCA Matrix)* ₹12,740

Illustration 6

Category of GDS Pre revised TRCA as on 1.7.2018 (Rs) Revised TRCA as on 1.7.2018 (Rs)
MD/SV work load of 3 hours 2,665-50-4,165 10,000- 24,470
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹2,815
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) ₹7,235
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-1 of TRCA Matrix) ₹0,000
4 TRCA on 1.7.2019 (Stage-2  of Level-1  of TRCA Matrix)* ₹10,300

gds-order-annexure2-Illustration4-6-paramnews

Illustration 7


Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
MD/SV work load of 3 hours 45 mts 3,330-60-5,130 10,000- 24,470
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹4,290
2 TRCA enhanced by fitment factor of 2.57(rounded off to the nearest rupee) ₹11,025
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-5 of Level-1 of TRCA Matrix) ₹11,260
4 TRCA on 1.7.2019 (Stage-6 of Level-1 of TRCA Matrix)* ₹11,600

Illustration 8

Category of GDS
Pre revised TRCA as on 1.7.2018
Revised TRCA as on 1.7.2018
MD/SV work load of more than 3 hours 45 mts & upto 5 hrs 4,220-75-6,470 12,000-29,380
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹4,670
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) ₹12,002
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-2 of Level-2 of TRCA Matrix) ₹12,360
4 TRCA on 1.7.2019 (Stage-3  of Level-2 of TRCA Matrix)* ₹2,740

GDS Annual Increment, Other Allowances, Dearness Allowance, Productivity Linked Bonus


Illustration 9

Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
BPM with work load of 3 hours 2,745-50-4,245 12,000-29,380
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 ₹2,845
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) ₹7,312
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-1 of TRCA Matrix) ₹12,000
4 TRCA on 1.7.2019 (Stage-2 of Level-1  of TRCA Matrix)* ₹12,360

gds-order-annexure2-Illustration7-9-paramnews

Illustration 10

Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
BPM with work load of 3 hours & 30 mts 3,200-60-5,000 12,000-29,380
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 3,200
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) 8,224
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-1 of TRCA Matrix) 12,000
4 TRCA on 1.7.2019 (Stage-2 of Level-1  of TRCA Matrix)* 2,360

Illustration 11

Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
BPM with work load of 4 hours 3,660-70-5,760  12,000-29,380
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 2,845
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) 7,312
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-1 of TRCA Matrix) 12,000
4 TRCA  on 1.7.2019 (Stage-2  of Level-1  of TRCA Matrix)* 12,360

Illustration 12

Category of GDS Pre revised TRCA as on 1.7.2018(Rs) Revised TRCA as on 1.7.2018(Rs)
BPM with work load of 4hours & 30 mts 4,115-75-6,365 14,500-35,480
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 4,115
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) ₹10,576
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-2 of TRCA Matrix) ₹14,500
4 TRCA on 1.7.2019 (Stage-2  of Level-2 of TRCA Matrix)* 14,940

gds-order-annexure2-Illustration10-12-paramnews



Illustration 13 

Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
BPM with work load of 5 hours 4,575-85-7,125 14,500-35,480
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 4,915
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) 2,632
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-1 of Level-2 of TRCA Matrix) 4,500
4 TRCA  on 1.7.2019 (Stage-2  of Level-2 of TRCA Matrix)* 4,940

Illustration 14 


Category of GDS Pre revised TRCA as on 1.7.2018 Revised TRCA as on 1.7.2018
BPM with work load of 5 hours 4,575-85-7,125 14,500-35,480
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2018 5,850
2 TRCA enhanced by fitment factor of 2.57 (rounded off to the nearest rupee) 15,035
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.2 above, if not, next stage above to the amount arrived as at SI No.2 i.e. Stage-3 of Level-2of TRCA Matrix) 15,390
4 TRCA on 1.7.2019 (Stage-4 of Level-2  of TRCA Matrix)* 15,860

GDS BPM drawing TRCA of  4830 from 1.7.2017 in the TRCA slab of 4575-85-7125 with annual increase of  85 on July

Category of GDS Pre revised TRCA as on 1.7.2018(Rs) Revised TRCA as on 1.7.2018(Rs)
BPM with work load of 5 hours 4,575-85-7,125 14,500-35,480
SI. No.
1 Assuming the basic TRCA of GDS as on 1.7.2017 4830
2 Annual increase of 185/- on 1.7.2018 4915
3 TRCA enhanced by fitment factor of 2.57 on 4915(rounded off to the nearest rupee) 12632
3 TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at SI No.3 above, if not, next stage above to the amount arrived as at SI No.3 i.e. Stage-1 of Level-2 of TRCA Matrix) 4500
4 TRCA on 1.7.2019 (Stage-2  of Level-2 of TRCA Matrix)* 14,940
*Assuming after completion of 12 months of continuous engagement from 1.7.2018

gds-order-annexure2-Illustration13-15-paramnews

GDS Revised Wages & Allowances: Payment for the period from 01.01.2016 to 30.06.2018 and arrears

Comments