Friday, 5 October 2018

Stone Mines Workers | Revised VDA & Minimum Wages w.e.f. 01.10.2018

Stone Mines Workers | Revised VDA & Minimum Wages w.e.f. 01.10.2018


File No.1/38/(4)2018 LS-II 
Government of India 
Ministry of Labour& Employment 
Office of the Chief Labour Commissioner-(C) 

New Delhi 
Dated: 28/9/2018 

ORDER 

In exercise of the powers conferred by the Central Government vide Notification No.S.O.189(E) dated 19th January, 2017 of the Ministry of Labour 85 Employment, the undersigned hereby revise the rates of Variable Dearness Allowance on the basis average consumer price index number for the preceding period of six month ending on 30.06.2018 reaching 288.33 from 286 (Base 2001 - 100) and thereby resulting in an increase of 2.33 points for Industrial workers and direct that this order shall come into force w.e.f. 01.10.2018. 

[post_ads]

RATES OF V.D.A.FOR EMPLOYEES EMPLOYED IN “STONE MINES” would be as under:-
Item of work Rates of Variable Dearness Allowance as on 01-10-2018
1. Excavation & removal of over burden with 50 meters lead/ 1.5 meters lift*
(i) Soft Soil Rs. 25
(ii) Soft Soil with rick Rs. 35
(iii) Rock Rs. 47
2. Removal and stacking of rejected stones with 50 metres lead/ 1.5 Meters lift* Rs. 19
3. Stone breaking or Stone Crushing for the Stone size of:-
1.0 inch to 1.5 inches
Above 5.0 inches
1.0 inch to 1.5 inches Rs. 141
Above 1.5 inches to 3.0 inches Rs. 120
Above 3.0 inches to 5.0 inches Rs. 72
Above 5.0 inches Rs. 59

Therefore, the minimum piece rate wages showing the basic and Variable Dearness Allowance payable w.e.f. 01.10.2018 to the employees employed in Stone Mines shall be as under:- 

Category Basic Wages VDA Total
1. Excavation & removal of over burden with 50 meters Lead/1.5 Meters lift *
(i) Soft Soil Rs. 351 + Rs. 25 = Rs. 376
(ii) Soft Soil with rock Rs. 531 + Rs. 35 = Rs. 566
(iii) Rock Rs. 703 + Rs. 47 = Rs. 750
2. Removal and stacking of rejected stones with 50 meters lead / 1.5 meters lift * Rs. 283 + Rs. 19 = Rs. 302
3. Stone Breaking or Stone Crushing for stone size of category ** Basic Wages VDA Total
(i) 1.0 inch to 1.5 inches Rs. 2171 + Rs. 141 = 2312
(ii) Above 1.5 inches to 3.0 inches Rs. 1857 + Rs. 120 = 1977
(iii) Above 3.0 inches to 5.0 inches Rs. 1088 + Rs. 72 = 1160
(iv) Above 5.0 Rs. 893 + Rs. 59 = 952

The workers employed on minimum guaranteed time rate of wages per day would be entitled to time rate of minimum wages plus special allowance, if any, for unskilled category of above ground workers revised from time to time by the Central Government in respect of scheduled employment in stone mines. 
  • Per 2.831 cube meters (100 cubic feet) 
  • Per truck load of 5.662 cubic meters (200 cubic feet) 
(J.K.SAGAR) 
CHIEF LABOUR COMMISSIONER (C) 

To 

As per list attached. 

[posr_ads_2]

vda-minimum-wages-wef-01-oct-2018-stone-mines-worker
vda-minimum-wages-wef-01-oct-2018-stone-mines-worker-2

Read More:-
Source: Click to view/download original order
[https://clc.gov.in/clc/node/586]

0 comments

Post a Comment